37,300 tons in ten years, chosen by more than 350 customers
From April 2016 to early November 2026 we delivered 6,205 orders. Floors and walkways at petrochemical plants, semiconductor fabs, power stations, data centers and airports are built with JUNIN grating.
- 37,300tDelivered over 10 years
- 6,205Delivery orders
- 350+Customers
- 4,736tDelivered in 2020
Over 3,000 tons delivered every year since 2018
With capacity of up to 1,000 tons a month, we have headroom to meet delivery dates even in years when large projects overlap.
By delivery date. 2016 covers April onward (after founding); 2026 covers deliveries through early November (grey bars). Ten-year total approx. 37,300 t.
What we deliver
Over the same period, 95% of volume (approx. 35,400 t) was grating and 5% (approx. 1,950 t) was stair treads. By bearing bar type, I-bar and serrated I-bar account for 70%.
April 2016 to early November 2026, by material specification
Key projects by sector
JUNIN grating was installed at the sites below, supplied through steel structure fabricators. Projects with 200 t or more delivered.
| Sector | Project | Owner / EPC | Period | Delivered (t) |
|---|---|---|---|---|
| Semiconductor | Samsung Electronics Godeok & Dongtan fabs (P3, P4, etc.) | Samsung C&T | 2019–2024 | approx. 3,630 |
| Petrochemical | SHAHEEN Project | S-OIL | 2024 | approx. 1,680 |
| Petrochemical | MFC Project | GS Caltex | 2019–2020 | approx. 1,280 |
| Petrochemical | HPC Project | Hyundai Chemical | 2020 | approx. 1,130 |
| Airport | Phase 4, Terminal 2 Baggage Handling System | Incheon International Airport Corp. | 2021 | approx. 920 |
| Overseas Plant | PEMEX DNBR Module (Mexico) | Samsung Engineering (now Samsung E&A) | 2021 | approx. 900 |
| Data Center | Gimpo Data Center | DL E&C | 2026 | approx. 820 |
| Power | Yeongheung Thermal Power Plant (indoor coal yard, etc.) | Korea South-East Power (KOEN) | 2022–2024 | approx. 790 |
| Battery Materials | EVBM Onsan Project | LS MnM | 2025 | approx. 650 |
| Petrochemical | G1-C3 Project | Lotte GS Chemical | 2023 | approx. 540 |
| Data Center | Anyang EPOCH Data Center | GS E&C | 2023 | approx. 400 |
| Automotive | Hyundai Motor Ulsan EV Plant | Hyundai Mobis | 2023 | approx. 310 |
Overseas projects
We began exporting to Vietnam (DOOSAN VINA) in 2018, and have supplied a PEMEX plant in Mexico through a Korean EPC contractor.
Main customers
Steel structure and plant companies we have worked with over the past ten years (alphabetical).
- Daewoo ST
- Geumseong E&C
- Hanmaek Heavy Industries
- POSCO Plantec
- Sebang Tech
- Seungyoung
- Shinan
- Yakdong Industrial
- Younghwa Engineering
- Youngshin